241. A production licence holder must carry out production tests for all the wells drilled for production that have not been subject to extraction tests so as to determine(1) the nature of the fluids therein;
(2) the petroleum production capacity per day, in m3, and the volume of water associated with that production; and
(3) the new geological, hydrostatic, petrophysical and geophysical characteristics of the pool.